On-time completion requires an agreed deadline for each task. A tick entered later should not silently rewrite when work finished.
Checks that answer this question
- Define due times and accepted completion.
- Count eligible tasks in the period.
- Record approved exceptions separately and explain their treatment.
Worked planning example
For example, 72 of 80 eligible tasks completed by their due times gives 90% on-time completion. It says nothing by itself about the quality of the accepted result.
Decision and acceptance check
Review late-task causes and acceptance evidence together. Do not improve the number by quietly moving deadlines after work is overdue.
Record the evidence
Use one row per observation rather than combining several different conditions. Record task deadlines, completion times, eligible total, exceptions and inspection status. Keep the original entry when adding the follow-up so that the change remains visible. If a field cannot be verified, mark it unknown and assign someone to resolve it before treating the record as complete.
Product and process boundaries
Keep assumptions visible and distinguish measured results from estimates. Compare the same scope, workload and time period before drawing a commercial conclusion. Include labour, rework, storage and service constraints where they affect the decision. Planning examples are hypothetical and do not represent quotations or guaranteed savings. Confirm current commercial terms directly with the supplier. The useful outcome is a decision someone can review later using the original inputs, not a precise-looking total built from uncertain figures.