Rewash cost includes more than the machine cycle. Measure the hands-on work required to sort, prepare and handle failed ware again.
Checks that answer this question
- Count rewash events over a defined period.
- Measure active labour per event.
- Apply the organisation’s appropriate hourly labour cost.
Worked planning example
For example, 30 rewashes requiring two labour minutes each equal one labour hour. At a hypothetical $24 per hour, that is $24 of labour before other costs.
Decision and acceptance check
Use the estimate to prioritise investigation, not to justify shortening the approved washing process. Recheck after a verified correction.
Record the evidence
Use one row per observation rather than combining several different conditions. Record rewash count, active minutes, labour-rate assumption, period and excluded costs. Keep the original entry when adding the follow-up so that the change remains visible. If a field cannot be verified, mark it unknown and assign someone to resolve it before treating the record as complete.
Product and process boundaries
Keep assumptions visible and distinguish measured results from estimates. Compare the same scope, workload and time period before drawing a commercial conclusion. Include labour, rework, storage and service constraints where they affect the decision. Planning examples are hypothetical and do not represent quotations or guaranteed savings. Confirm current commercial terms directly with the supplier. The useful outcome is a decision someone can review later using the original inputs, not a precise-looking total built from uncertain figures.